A visual record of the project. Photos get grouped by phase: site as we found it, tower-plans references, septic install in progress, finished work, inspection, tower build.

Keep the original record

Send photos through the existing email/Drive route. Keep original files together with their date, photographer and a short description. The project archive preserves them unchanged; website copies are resized for easier viewing. This update uses Eli’s email and Drive files.

July 27, 2026: uncovered septic work

Eli sent eighteen original photos and a video link in his July 27 reply to the request for a pre-cover record. These six views show the tank connections, boxes, open trenches and measurement photographs. They do not establish final inspection, authorized backfill or compliance. Dave confirms those steps remain unfinished as of September 7.

Septic tank, access riser and exposed connection toward the drainfield.
Septic tank, access riser and exposed connection toward the drainfield. Photo sent by Eli, July 27, 2026. Open larger image.
Exposed pipework linking concrete boxes at the head of the drainfield.
Exposed pipework linking concrete boxes at the head of the drainfield. Photo sent by Eli, July 27, 2026. Open larger image.
Close view of the wrapped drainfield line before cover; product identification still needs the material record.
Close view of the wrapped drainfield line before cover; product identification still needs the material record. Photo sent by Eli, July 27, 2026. Open larger image.
Open drainfield trench and its wrapped line along the slope.
Open drainfield trench and its wrapped line along the slope. Photo sent by Eli, July 27, 2026. Open larger image.
Tape-measure photograph to retain with the field measurements; no exact depth is certified from this image.
Tape-measure photograph to retain with the field measurements; no exact depth is certified from this image. Photo sent by Eli, July 27, 2026. Open larger image.
Eli’s original inlet/outlet annotations at a concrete box, preserved as his field description.
Eli’s original inlet/outlet annotations at a concrete box, preserved as his field description. Photo sent by Eli, July 27, 2026. Open larger image.

The complete original photo set and the video reference remain in the project archive. Compare the images with the permit and as-built checklist before work is covered. The water plan addresses the separate upper-site fill task.

Galleries

Dave and Barb

Dave and Barb under a flowering tree, spring 2025

Spring 2025.

Septic tank set — July 13, 2022

Tank being lowered

The concrete septic tank being lowered into the excavated pit by crane truck. Worker guiding the lower. Bright summer day. This is the anchor moment for “construction started several years ago” — the tank was set, then the work paused.

Front gate before the damage

Feller-buncher arriving past the intact gate

Red feller-buncher logging machine being delivered past Dave’s then-intact front gate during the early-2025 logging operation. The original wrought-iron gate stands undamaged at this point.

Front gate after the truck driver — November 30, 2025

Damaged gate

The same gate after a truck driver hired by Solid Rock Construction (Alex) damaged it. Hinge hardware ripped from the post, gate leaning sideways. This is the photo Dave sent Solid Rock that same day, and the trigger for the informal gate-for-septic-advice agreement.

What’s already in the ground

See the recovered July 27 installation record above and the Septic System page.

Septic install in progress

The July record shows work before final drainfield backfill. Later photos will document the inspection outcome and approved cover.

Tower build

(future phase)